The new paint looks great! It really brings out the house's detail. There is still exterior repair work ... columns, the solarium and railing and right over the front entrance. We'll finish painting in the spring. We used 2 coats of a special lead encapulating primer, then 2 coats of Sherwin Williams' Duration paint (a lifetime paint). Used colors "Anjou Pear" for the main body, and "Humble Gold" for the trim, and a linen with yellow hue for the white trim.
The solarium floor is rebuilt. After it is inspected, next will come installing the new flooring, rebuilding the boxes, new columns and sides, then re-installing the windows.
The elevator shaft was one of the major framing projects in the house.
Here is a shot looking up from the 1st floor (where the kitchen is) up to Bill (the owner of the framing company) who is on the 2nd floor and looking up into the 3rd floor.
when they were first
framing it out.